A newly purchased home creates a rare planning window. Decisions about layout, structure, bathroom, kitchen, heating and floors are easier to coordinate before you move in—but only when the technical dependencies are understood.

Start with the information already available
A sales brochure and floor plan can reveal the first questions before access is possible.
Send this for the first assessment
- Funda link or sales brochure
- Technical inspection report if available
- Photos of the meter cupboard, boiler, floors and existing services
- Your three most important changes
- Key-transfer, preferred start and moving dates
- Any VvE documents, drawings or quotations already received
What expat buyers often need explained
Ownership does not automatically mean every change is permitted. Apartments may require VvE approval. Structural work may require an engineer. Municipal rules can apply to façades, extensions or protected properties. These responsibilities should be identified before the construction schedule is treated as fixed.
Build around dependencies, not wish lists
A kitchen move affects drainage, water, ventilation, electrical capacity, floors and walls. Underfloor heating affects floor buildup and drying time. A new opening may affect structural design and permissions. Planning these as one package reduces avoidable rework.
Frequently asked questions
Should I contact you before receiving the keys?
Yes, if the plans are already serious. The first assessment can start from documents, followed by a site visit when access is available.
Can I move in during construction?
That depends on dust, noise, water, electricity and safe access. It should be discussed before committing to a moving date.